A construction permit has been issued for the first building in the Park Boulevard Phase 3B project. Located at 42 W. 37th St, the new construction is part of a larger plan to redevelop the site of the former CHA Stateway Gardens housing projects. Stateway Associates LLC is the developer behind the project.,

With a design from Johnson and Lee Architects, the new construction will consist of a five-story poured-in-place concrete residential building. The structure will hold 40 residential units with 23 exterior parking spaces and 11 interior parking spaces. The ground floor will hold interior parking, a mailroom, bathrooms, and the elevator lobby. The unit mix consists of two studios, 12 one beds, 25 two beds, and one three-bedroom dwelling. 

Park Boulevard Phase 3B - 42 W. 37thJohnson and Lee Architects

As part of the larger Park Boulevard Phase 3B, this structure will be built alongside a companion building that will, between the two, total 80 units of housing. Four units will be targeted at income levels at or below 60% AMI. 64 apartments will be targeted for income levels at 60% AMI, with 36 of those positioned as CHA units. Totaling 68 affordable residences, the remaining 12 will be market-rate. The affordable units are expected to be split evenly between the two buildings.

As reported by Chicago YIMBY in June 2021, the project has received $6 million in TIF money from the city, with caisson permits issued in July. With full building permits in hand, general contractor Walsh Construction can proceed with construction through completion.

Park Boulevard Phase 3B - 42 W. 37thJohnson and Lee Architects