Demolition permits have been issued for the strip mall located at 4501 N. Sheridan Rd in Uptown. The site of a new mixed-use development, the project will occupy the parcel at the northeastern corner of the intersection of N. Sheridan Rd and W. Sunnyside Ave. Planned by Chicago-based Mavrek Development, plans for construction to commence in 2022 were announced via Alderman Cappelman’s recent constituent newsletter.

4501 N. SheridanNORR

With a design from NORR, the mixed-use building will hold 59 residential units and 7,000 square feet of ground floor retail space. 35 car parking spaces will be provided at the rear of the site in a surface parking lot. Residential amenities will include a fitness center, outdoor terraces, and a coworking lounge. 

4501 N. SheridanNORR

Rising five stories, the building massing will be broken down into multiple intersecting volumes using contrasting materials. Windows will interrupt the facade with punched openings framed in metal trim. Balconies will protrude out from the building envelope.

The reported $17.3 million project is being executed as of right under the site’s existing zoning. The structure will replace one portion of the existing strip mall which currently holds a laundromat, pawn shop, and Sunnyside Health Center. With no construction permits filed, a timeline for completion is currently unknown.