Three demolition permits have been issued to make way for the new Pui Tak Christian School building. Proposed for a site in Bridgeport at 3118 S. Canal, the new school will replace a surface parking lot in addition to the three existing buildings on the site. 

Pui Tak Christian School at 3118 S. CanalSOM + Wight & Company

The Pui Tak Christian School was founded in 1953 to equip young students academically and spiritually and teaches students from preschool all the way through 8th grade. The school is looking to build the new facilities due to a collection of challenges including the fact that their current facility is at capacity, they have limited classroom space and are using mobile and temporary classrooms. They also have insufficient bathrooms and are split between two different buildings. 

Pui Tak Christian School at 3118 S. CanalSOM + Wight & Company

With SOM and Wight and Company collaborating on the design, the new building would stand four stories high and offer space for approximately 400 students and 45 staff members. Rising 55 feet, the school is massed sensitively to the area, setting back 57 feet from the street, as well as 37 feet from the south to create a buffer between the school and nearby residential homes. This space along the south side of the property will be occupied by a playground for the students. 

Pui Tak Christian School at 3118 S. CanalSOM + Wight & Company

The entry to the school will be pronounced with an inset along the bar-shaped plan, with a portal-like space that exhibits openness and transparency. The gymnasium will float above the staff parking to the north of the entry as a glowing, frosted glass box, while classrooms will span the length of the building south of the entry. 

Pui Tak Christian School at 3118 S. CanalSOM + Wight & Company

 The ground floor of the school will be host to the reception and staff office as well as five Pre-K rooms. On the second floor, the aforementioned gymnasium will double as the auditorium and will be accessible to the public for events through a stair and elevator. The remainder of the second floor will hold the library and junior kindergarten rooms.

Pui Tak Christian School at 3118 S. CanalSOM + Wight & Company

On the third floor, students will have access to the cafeteria and art room, as well as kindergarten and first grade classrooms. Classrooms for 2nd through 8th graders will be located on the fourth floor, as well as the language room, music room, and science room. 

Pui Tak Christian School at 3118 S. CanalSOM + Wight & Company

The building will have a sustainable design by utilizing a green roof, installing solar panels, retaining rainwater, using an energy-efficient HVAC system, using vertical fins for self-shading, providing permeable pavers and extended landscaping on the site, alongside a host of other efforts. 

Pui Tak Christian School at 3118 S. CanalSOM + Wight & Company

With demo permits issued, the three-story building at 3130 S. Canal, the one-story building at 3136 S. Canal, and the three-story building at 3140 S. Canal will all be razed to make way for the development. The school has been working on this plan for a number of years and even acquired the property back in April 2019. The school is looking towards 2024 or 2025 as a target for construction.