Construction is expected to start in March on the residential development at 5356 N. Sheridan. Currently home to the existing Wing Hoe Restaurant building, the project is located on a corner lot at the intersection of N. Sheridan Rd and W. Balmoral Ave. Tempus Real Estate Group is the developer behind the proposal.
With a design from 2R/Z Architecture, the new construction will deliver a five-story residential building. Planned with no retail space, the project will hold 50 residential units split between 34 one-beds and 16 two-beds, with 25 car parking spaces and 38 bike parking spaces. Rising 74 feet, the building will be a concrete structure with fiber cement panels in varying colors and size generating a patterned facade matched with metal and aluminum panels.
The design creates a unique, modern apartment living option that provides a continuous frontage along both of the streets. The ground floor facade activates the pedestrian experience with increased vegetation and continuity along the sidewalk. Lofted residential units will face W. Balmoral Ave, with the residential entry facing N. Sheridan Rd. The L-shape volume is oriented to maintain the street walls, with balconies inset into the facade.
The development will include 5 affordable units on-site, with a makeup of 3 one-beds and 2 two-beds, all targeted for those making up to 60% AMI.
According to 48th Ward Alderwoman Leni Manaa-Hoppenworth’s newsletter, permits for demolition have been submitted and approved for January 2024, and the subsequent construction on the building is set to commence in March 2024 with general contractor DOM Properties Investment.